Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3948.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jun 16, 2008     NACA scoop (forward) - (2.9 hours)       Category: Fuselage
I positioned the NACA scoop on the left side of the fuselage, and drilled and clecoed it to the skin. Then I deburred and dimpled the skin, and countersunk the plastic scoop. Since I'll be installing the scoop with rivets, I needed a backing plate for the flange of the scoop, so I fabricated one out of scrap 0.20 aluminum. I match-drilled the ring and primed and painted it.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.